

Project TPP-01: “TE-TO Novi Sad” TPP, A1 Unit,
Projects GroupThermal Power Plants (TPP) Hydro Power Plants (HPP) Other Industry Sectors (OIS) Basic Project Data Project Name: Protective and Monitoring Systems for Thermal Expansion of the Steam Turbine Investor: “Panonske elektrane” Novi Sad, Serbia Object Name: “TE-TO Novi Sad” Thermal Power Plant, A1 Unit Installed Power: 135 MW Object Location: Novi Sad, Vojvodina, Serbia Brief Project...

Project TPP-02: “Kolubara A” TPP, A5 Unit,
Serbia
Projects GroupThermal Power Plants (TPP) Hydro Power Plants (HPP) Other Industry Sectors (OIS) Basic Project Data Project Name: Vibration Protection System for Flue Gas Fan Investor: “Termoelektrane Nikola Tesla” Obrenovac, Serbia Object Name: “Kolubara A” Thermal Power Plant, A5 Unit, Flue Gas Fan Installed Power: 110MW Object Location: Veliki Crljeni, Serbia Brief Project...

Project TPP-03: “Kolubara A” TPP, A3 Unit,
Serbia
Projects GroupThermal Power Plants (TPP) Hydro Power Plants (HPP) Other Industry Sectors (OIS) Basic Project Data Project Name: Protective and Monitoring Systems for Thermal Expansion of the Steam Turbine Investor: “Termoelektrane Nikola Tesla” Obrenovac, Serbia Object Name: “Kolubara A” Thermal Power Plant, A3 Unit Installed Power: 65 MW Object Location: Veliki Crljeni, Serbia Brief Project Description:...

Project TPP-04: TE “Kostolac B” TPP, B1 Unit,
Serbia
Projects GroupThermal Power Plants (TPP) Hydro Power Plants (HPP) Other Industry Sectors (OIS) Basic Project Data Project Name: Sensor Calibration and and Measurement Line Checking of Vibration Protection System at A1 Unit Investor: IMP Automatika Ltd, Serbia Object Name: “Kostolac B” Thermal Power Plant, A1 Unit Installed Power: 2x348MW Object Location: Kostolac-Drmno, Serbia Brief Project Description: The project consisted of two parts. The first part referred to calibration of vibration sensors of the protection system, whereas the second part represented checking of the measurement line of Vibration Protection System, including checking the alarm level on A1 Unit Turbine Generator Set. The project was realized jointly by NORTH Control Ltd and NORTH Protection Ltd, Members of NORTH Group, Serbia....

Project HPP-01: “Vrla 1” HPP, 1A, 1B, 1C, 1D Units,
Serbia
Projects GroupThermal Power Plants (TPP) Hydro Power Plants (HPP) Other Industry Sectors (OIS) Basic Project Data Project Name: Vibration Protection and Monitoring System Investor: “Hidroelektrane ?erdap” Kladovo, Serbia Object Name: “Vlasinske HE” Surdulica, “Vrla 1” Hydro Power Plant, 1A, 1B, 1C and 1D Units Installed Power/Turbine Type: 2×11.2 MW; 2×14.5 MW/Pelton Object Location: Surdulica, Serbia Brief Project Description: Vrla 1 HPP has four units with Pelton type turbines. The total installed power of the power plant is 50MW. This project is realized as part of the rehabilitation of the HPP control system. Up to now, delivery, installation and commissioning of four VM-600 monitoring systems by MEGGITT have been completed. Apart from functioning as vibration protection systems independent of SCADA/DCS, all installed systems are also integrated into the power plant control system. Protection levels are set according to ISO 10816-5:2000 and ISO 7919-5:2005 standards. The project has been realized jointly by IMP Automatika Ltd, Serbia, NORTH Point Ltd, NORTH Protection Ltd and NORTH Control Ltd, Serbia. Below is a schematic map of the units and topology of sensors of the vibration protection system. Legend 1. Measurement Line of Relative Shaft Vibration, ISO 7919-5 2. Measurement Line of Absolute Bearing Housing Vibration, ISO 10816-5 3. Measurement Line of Absolute Stator Core Vibration 4. Measurement Line of Rotor Axial Position 5. Measurement Line of Rotational Speed and Key Phasor ...
